Variante Andes investigation
Rotary boreholes by conventional methods with continuous core recovery and seismic refraction lines for the “Troncal Andes” road project, along a stretch of roughly 2.9 km.

Fourth-generation motorways, airports, mass transit systems, water and sewer networks, industrial buildings and facilities for the energy sector.
More than ten years in business and over five hundred projects delivered as consultant, contractor and construction supervisor. The selection below is not about volume but about range: projects that run from ground investigation and the assessment of existing structures through to the construction of industrial buildings and hydraulic works, in geographies stretching from the San Andrés archipelago to the Eastern Plains.
Rotary boreholes by conventional methods with continuous core recovery and seismic refraction lines for the “Troncal Andes” road project, along a stretch of roughly 2.9 km.
Geotechnical investigation and laboratory testing for the integrated management of the adaptation and construction of the Transmilenio bus depots in Bogotá.
Geotechnical study for the scour assessment of bridges and retaining walls on Functional Units 1, 2, 3 and 4 of the Ruta 40 Bogotá – Girardot road consortium.
Studies and designs of the geotechnical and pavement components for the construction of the drainage system and runway safety areas at Riohacha Airport, for Aerocivil.
Rotary boreholes by conventional methods with continuous core recovery and seismic lines for the “Cajicá Ring Road” project, along a 5.0 km stretch.
Geotechnical investigation and laboratory testing for the detailed geotechnical design of a 47.5 km stretch of road near the municipality of San José del Guaviare.
Vulnerability and structural pathology assessment of the twelve structures along Canal Córdoba: the Calle 129 box culvert, road bridges from Calle 134 to Calle 167 and the Calle 170 culvert.
Studies and designs covering geotechnics, pavements, building pathology, seismic vulnerability and structures (Phase III) for the upgrade of the passenger terminal, ancillary areas and the fire station.
Rotary boreholes by conventional methods with continuous core recovery for road works on the Devinorte concession, at the Autopista Norte exit in Bogotá.
Geotechnical investigation by conventional and geophysical methods to complete the design of structures associated with Functional Units 2A, 2B, 3A and 4.
Engineering, procurement and construction of the hazardous waste store (RESPEL) at the Bolívar substation on the ISA Intercolombia network.
Engineering, procurement and construction of the UHY Consultores offices, including services and furniture, for a total area of 450 m².
Civil works for the upgrade of the Usaquén control structure for the Bogotá Water and Sewerage Company.
Optimisation, updating and completion of the Phase II and III studies and designs for the extension of the Transmilenio NQS trunk line in the municipality of Soacha.
Design for the renewal of the water supply and foul and storm sewerage networks of Las Ugas 196, 198, 199 and associated sectors, within the EAAB – ESP Zone 3 service area.